QSS-025-01-L-D-A-GP is available for purchase but is not normally stocked.
Available Substitutes:
Similar
Similar
Similar
Similar

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.
QSS-025-01-L-D-A-GP | |
|---|---|
DigiKey Part Number | QSS-025-01-L-D-A-GP-ND |
Manufacturer | |
Manufacturer Part Number | QSS-025-01-L-D-A-GP |
Description | CONN SOCKET 50POS SMD GOLD |
Manufacturer Standard Lead Time | 5 Weeks |
Customer Reference | |
Detailed Description | 50 Position Connector Socket, Center Strip Contacts Surface Mount Gold |
Datasheet | Datasheet |
EDA/CAD Models | QSS-025-01-L-D-A-GP Models |
Product Attributes
Filter Similar Products
Show Empty Attributes
Category | Number of Rows 2 |
Manufacturer Samtec Inc. | Mounting Type Surface Mount |
Series | Features Board Guide, Ground Bus (Plane) |
Packaging Tray | Contact Finish Gold |
Part Status Active | Contact Finish Thickness 10.0µin (0.25µm) |
Connector Type Socket, Center Strip Contacts | Height Above Board 0.143" (3.63mm) |
Number of Positions 50 | Base Product Number |
Pitch 0.025" (0.64mm) |
Report Product Information Error
Documents & Media
Environmental & Export Classifications
Product Questions and Answers
Additional Resources
Substitutes (4)
| Part Number | Manufacturer | Quantity Available | DigiKey Part Number | Unit Price | Substitute Type |
|---|---|---|---|---|---|
| QSS-025-01-F-D-A | Samtec Inc. | 0 | 3937-QSS-025-01-F-D-A-ND | $6.68000 | Similar |
| QSS-025-01-H-D-A | Samtec Inc. | 0 | QSS-025-01-H-D-A-ND | $12.79000 | Similar |
| QSS-025-01-L-D-A | Samtec Inc. | 0 | SAM8845-ND | $7.81000 | Similar |
| QSS-025-01-L-D-A-GP | Samtec Inc. | 0 | 3937-QSS-025-01-L-D-A-GP-ND | $9.32000 | Similar |
Available To Order
Check Lead Time
Quantity
All prices are in USD
Tray
| Quantity | Unit Price | Ext Price |
|---|---|---|
| 48 | $9.32000 | $447.36 |
Tariff Status: Tariff may apply if shipping to the United States. Estimated tariff costs will be calculated and displayed in the shopping cart to help you assess potential expenses.




